Home/Landscape design and outdoor works/Surveying and earthworks

Land surveying and earthworks in Cyprus

Aegean Living Design & Build
Limassol
Speaks: Ελληνικά, English, Русский
4.5
6 reviews
  • Reviews only from completed orders
  • 12 years of experience
  • Special offer
Aegean Living Design & Build is a full-cycle studio in Limassol: we design, build and fit out modern homes in ...Details
from 500 €
from 50 €/hour
from 3 €/m²

You may have been looking for

Service prices

Finished projects

Turnkey kitchen and three bathrooms in a Germasogeia villa
Aegean Living Design & Build
Aegean Living Design & Build
Mediterranean garden and pool deck for a Larnaca villa
Aegean Living Design & Build
Aegean Living Design & Build
Full renovation of a seafront apartment in Larnaca
Aegean Living Design & Build
Aegean Living Design & Build
Terraced hillside villa above Paphos: architectural design
Aegean Living Design & Build
Aegean Living Design & Build
Villa finishes in Protaras: microcement, lime and travertine
Aegean Living Design & Build
Aegean Living Design & Build
Courtyard villa in Nicosia: turnkey interior
Aegean Living Design & Build
Aegean Living Design & Build
Hammam, sauna and fireplace for a villa in Paralimni
Aegean Living Design & Build
Aegean Living Design & Build
Seafront penthouse interior in Limassol
Aegean Living Design & Build
Aegean Living Design & Build
View all

Reviews of professionals

Surveying and earthworks: preparing a plot for construction

Frequently asked questions

What surveys are needed before earthworks? +

At minimum, a topographic survey of the plot with levels and the setting out of the future buildings. The contractor uses these to calculate soil volumes and choose machinery, and after the works the surveyor checks the finished levels.

Who arranges approval for soil removal? +

Removal is usually organised by the earthworks contractor. The local authorities or a licensed professional can tell you where the soil may be taken and whether approvals are needed. Make sure the offer states who is responsible for this.

Are foundations part of the earthworks? +

No, earthworks end with a prepared excavation and formation. Foundations are built by a construction crew to an engineer’s design and are ordered separately.

Can a land surveyor determine the plot boundaries? +

A land surveyor can set out the boundaries on site from the existing documents, but title registration and boundary disputes are handled separately. Check the specialist’s qualifications and which documents they will need.

What if there is rock under the plot? +

Mention it in advance or ask for a ground investigation: rock needs different machinery, such as a hydraulic breaker, and more time. It affects the estimate, so compare offers based on the same ground conditions.